Field

Built for one thumb, in the sun.

Gloves on, screen washed out, one bar of signal, and a truck door about to close. Every field surface in BLT was drawn for that hand and that minute — not for a laptop on a clean desk.

Start for free See the crew portal
Now on iPhone · the crew portal needs no download at all
Worker in a hard hat on an active site
Three rules

What “field-first” actually means here.

Not a phone-shaped version of the desktop screen. Three constraints we hold every field surface to, and the reason each one exists.

44pxTouch

No tap target smaller than 44 by 44 points, anywhere, ever. A framer with cold hands and work gloves should never have to take a glove off to hit a button, and nobody should have to look twice to confirm they hit the right row.

RowsFull-width, single-column, thumb-reachable
Text16px floor — readable at arm’s length in daylight
1 tapCamera

The camera is one tap from anywhere in the app. Photo documentation only happens if it costs less than not doing it — ten seconds to shoot, tag a phase, and get back to work, or it will not happen on hour eleven of a pour.

ShootReceipt, progress, or safety, same button
TagPhase proposed from GPS and time of day
OfflineState

A dead zone is a state the app is in, not an error it shows you. Basements, elevator shafts, and the back half of a hundred-acre site are the normal case. Capture keeps working and the queue drains when you hit the road.

QueueCounts up quietly, never blocks the next capture
SyncResumes in order, no tap required
Field surfaces

Eight things the site does. All of them here.

Every one of these writes to the same project, the same phases, and the same ledger the office is reading. There is no second system anyone has to reconcile at the end of the month.

And messaging on every one of them
One day, one site

What the field writes without opening a laptop.

Cedar Street · Tuesday
6:48aClock inFive of five crew clocked in through the portal. GPS verified at the site boundary.5 on site
7:12aPhotoRoof deck sheathing, north elevation. Tagged framing, day 8.3 shots
7:14aVision AITwo workers on the deck edge with no visible fall protection. Flagged and routed to the PM.1 flag
7:52aReceiptFerguson Plumbing Supply, six line items read off the photo and posted to rough-in.1,059.18
10:20aRequestPurchase request raised from the aisle for 1,310 of flex duct. Waiting on approval.1,310.00
1:05pInspectionFraming inspection passed. Signed sheet photographed and attached to the phase.Passed
3:40pScheduleInsulation moved two days — the drywall sub confirmed the new start in the thread.+2 days
4:31pClock out42.5 hours logged across framing and rough-in, already on the right lines.42.5 hrs
Nobody typed a summary. The office read the same rows in real time.
Same data, two hands

The field isn’t a data entry department.

Everything the crew does on the phone is a byproduct of doing the work — a photo they were going to take anyway, a clock-in they have to do anyway, a receipt already in their hand. The office gets a complete record because nobody was asked to build one.

  • No end-of-day report to write, no timesheet to transcribe on Sunday
  • Hours, photos, and receipts arrive already carrying a project and a phase
  • The manager’s dashboard is reading the same rows, not a nightly export
  • Ask BLT works from the field too — the PM can check a line from the truck
See what it writes into the ledger
Crew laid out across a slab pour on a wide site

Put it in the hand that’s already holding a tape.

Every field surface, one project, no card. The crew portal takes a text message and thirty seconds.