Three phases, three trips, three chances for the money to walk. BLT keeps the pipe, the fixtures, the allowance the builder wrote, and the hours your crew actually burned on the same four-column line — so you know where the job stands before the tile guy shows up.
Full AI on the free plan · no card
A 3,200 square foot custom with three and a half baths. The bid was written in January, the underground went in during February, and the fixtures were selected in June by a homeowner who had never heard the word allowance.
| Line | Baseline | Current | Committed | Actual |
|---|---|---|---|---|
| Underground & DWV below slab | 6,200 | 6,200 | — | 6,040 |
| Pipe & fittings | 7,800 | 7,800 | — | 8,930 ↑ |
| Water heater & recirc | 3,400 | 4,150 | 4,150 | — |
| Fixtures & trim (allowance) | 11,000 | 13,600 | 5,200 | 6,180 |
| Rough-in labor | 12,500 | 12,500 | — | 11,320 |
| Set & trim labor | 7,200 | 7,200 | — | 840 |
| Contract total | 48,100 | 51,450 | 9,350 | 33,310 |
Your lead is at the supply house before the gate opens and under a house by mid-morning. What he records has to survive a wet phone, no signal, and a crawlspace.
Underground is complete, rough is at 88%, set hasn’t started. That’s a progress billing you can defend with hours, receipts, and a signed inspection instead of a phone call with the builder’s super.
An allowance is a number written by somebody who has never stood in a showroom. By the time the selections come back, the spread between what was budgeted and what was picked is your problem to price — usually on a Friday, usually from memory.
Underground gets covered by a foot of gravel and a slab. Rough gets covered by drywall. The only thing left after that is the record you kept the morning it passed.
Every test carries the time it was set, the pressure it held, who signed it, and the photographs from that morning. When a leak turns up in November, the file says whether it was yours.
Name the phases in your own words. Hours, receipts, inspections, and the pay application all follow the same split.
Sleeves, DWV below slab, and the water service. Two days of work you can never look at again.
Supply, waste, vent, and gas, plus the hours behind them. Closed by a test with a gauge photo on it.
Fixtures, valves, and the water heater — bought at selection pricing, months after the allowance was written.
The callback, the adjustment, the eleven-month walk. Billable when it should be, tracked when it isn’t.
One job free, every feature, no card. Bring the allowance sheet and the last three supply house invoices.